How installation and the grant application work

The work itself is only one part. For this grant, official guidance is that you apply first and wait for OZEV to confirm you are eligible before any installation starts.

Last checked 25 November 2026.

The official sequence

  1. Find an OZEV-authorised installer and get a dated quote. You must use an authorised installer and a chargepoint on the eligible model list. Find an installer · Eligible models
  2. Collect documents and permissions. GOV.UK says you will need a dated quote; written permission from your landlord, freeholder or property manager; written permission from your local authority if you live in a listed building; a utility bill in your name at the installation address; and a copy of your tenancy agreement if you are renting. Find a Grant adds that the utility bill should be less than 3 months old, and sets out extra documents for shared ownership, armed services accommodation, and a vehicle on order. See the permissions guide.
  3. Apply online, before any work starts. Use the “Start new application” button on the official grant pages and create an account if you need one. Since 1 April 2026 this grant has used a new platform.
  4. Wait for OZEV's confirmation. OZEV said that, at least initially, it estimated up to 10 working days to assess applications and claims on the new platform. You and your installer should both be notified. Do not have the chargepoint installed until that confirmation arrives.
  5. The installer carries out the work. Grant-eligible equipment has to meet OZEV's minimum technical specification and be installed to the current wiring rules. The specification says that where standards appear inconsistent, the IET Wiring Regulations (BS 7671) take precedence for electrical installation requirements. Equipment must also come with an on-site 3-year warranty on parts and installation. GOV.UK - Residential chargepoints: minimum technical specification (last updated 2 August 2023)
  6. The installer claims the grant. They give OZEV details of the chargepoint, photographs of the installation, and an invoice that shows the total cost minus the grant. From 1 April 2026, claims must include a close-up of the chargepoint, a photo showing the model and serial number, a photo of the chargepoint with the parking space, and a wide view of the building or space. OZEV emails you to check the claim. If it approves it, it pays the installer.

What the installer is checking on site

Official pages do not publish a minute-by-minute job list, and we are not inventing one. GOV.UK does say the installer will assess whether your parking space allows an electric vehicle to charge safely. A thorough quote should also cover a safe connection to your electrical supply. If the survey finds extra work is needed, get that in writing before you agree.

Audits

OZEV may audit the application before it is approved, and may audit the installation. It may arrange a site visit. If you do not allow this or do not respond, it may cancel the application.

If you need help

GOV.UK says you can speak to your installer or contact the Government Grant Managed Service at ggms.flatsandrenters@cabinetoffice.gov.uk. Include your name and, if you have them, your application reference and your installer's business name and OZEV number.

Related: tethered or untethered · smart-charging rules · costs

Sources

All sources opened and checked on 25 November 2026. Grants, prices and rules change, so check the source before you rely on a figure.

  1. GOV.UK - Electric vehicle chargepoint grant for renters or flat owners: Apply
  2. GOV.UK Find a Grant - Electric Vehicle Chargepoint Grant for Renters and Flat Owners (closes 31 March 2027, 11:59pm)
  3. GOV.UK - Changes to electric vehicle chargepoint grant schemes from 1 April 2026 (last updated 7 July 2026)
  4. GOV.UK - Electric vehicle chargepoint grant for renters or flat owners: Eligibility
  5. GOV.UK - Find an electric vehicle (EV) chargepoint installer
  6. GOV.UK - Eligible EV chargepoint model list
  7. GOV.UK - Residential chargepoints: minimum technical specification (last updated 2 August 2023)

Common questions

Can I get the grant after the charger is already fitted?

No. Official guidance says you cannot apply if the chargepoint has already been installed, and that it must not be installed before OZEV confirms you are eligible.

How long does OZEV take to approve an application?

In its April 2026 scheme-change guidance, OZEV estimated it would initially take up to 10 working days to assess applications and claims on the new platform. Treat that as an estimate, and use the confirmation email as the signal to start work.