The EV chargepoint grant for renters and flat owners
This is the main official grant for people who rent their home, or who own and live in a flat, and want a chargepoint on private off-street parking. It is run by the Office for Zero Emission Vehicles (OZEV).
Last checked 25 November 2026. Always confirm the current rules on GOV.UK and Find a Grant.
What you can get
GOV.UK says you can get 75% off the cost of buying and installing a socket, up to a maximum of £500.
That cap matters. If 75% of the quote is more than £500, you still only get £500. If 75% is less than £500, you get the lower figure. See the cost guide for how that works on published price ranges.
From 1 April 2026 the maximum rose from £350 to £500 per socket. Residents can apply for one socket. GOV.UK - Changes to electric vehicle chargepoint grant schemes from 1 April 2026 (last updated 7 July 2026)
The Find a Grant page says you are only eligible for one grant under this scheme.
How long the grant is open
Funding is confirmed until 31 March 2027. The Find a Grant page gives a closing time of 11:59pm (midnight) on that date. OZEV has described this as a final year of funding for the home and workplace chargepoint grants.
The government reserves the right to end or change the scheme. If it does, it says it will aim to give 4 weeks' notice and will honour claims made before any public announcement, subject to the grant criteria.
Who can apply
GOV.UK says you can apply if all of the following are true:
- you live in a flat that you own (this includes flats bought through the shared ownership scheme), or you rent a residential property;
- your home has its own private off-street parking space;
- you own or use an eligible vehicle.
The property must be in the UK. You cannot apply if you live in the Channel Islands or the Isle of Man. You can only apply for an existing residential property that you live in, not an unoccupied property or one that is still being built.
Your parking space
GOV.UK says the space must be:
- off-street, private and clearly defined — it does not have to be part of the property;
- accessible to you at all times;
- one you own or have the legal right to.
You must have proof of all legal rights and permissions, such as from the freeholder of a block of flats. Your installer will assess whether the space allows an electric vehicle to charge safely.
Your vehicle
The grant is only for vehicles on the list of OZEV-approved electric vehicles. You must provide evidence that you own or use an eligible vehicle. GOV.UK says this can be:
- as a registered owner;
- if you have leased one for at least 6 months;
- if you have used one as a work vehicle for at least 6 months;
- if you currently have one on order.
The Find a Grant page also says an ordered vehicle should be received within 3 months, and lists registered keepers, people assigned a company car, people who lease an eligible vehicle, and people named by their employer as the primary user. If your situation is not straightforward, check both official pages and talk to your installer.
If your vehicle lease is a bundle with a chargepoint, official guidance says the lease must state that you own the chargepoint once payment is complete, itemise the cost of the chargepoint and installation including VAT, meet the warranty rules, and run for at least 6 months. You must show your installer proof that you own or lease the vehicle.
Who cannot apply
GOV.UK says you cannot apply if:
- you live in a house that you own (unless it is converted into flats and you live in just one of the flats);
- you rent accommodation where the landlord or homeowner lives — for example, if you are a lodger in someone else's home;
- you are moving house or planning on moving;
- you have already claimed the grant, or its predecessors the Electric Vehicle Homecharge Scheme (EVHS) or the Domestic Recharge Scheme;
- there must by law be a chargepoint or charging infrastructure — for example because your home is a new build.
You also cannot apply if the chargepoint has already been installed. Official guidance is clear: the chargepoint must not be installed before OZEV confirms you are eligible.
Find a Grant gives more detail on the “mandatory requirement” rule. It includes buildings under construction or being renovated where Building Regulations Part S applies in England (from 15 June 2022), similar rules in devolved nations (it gives the Building (Scotland) Regulations from 5 June 2023 as an example), and planning conditions that require chargepoints or infrastructure.
How the grant is paid
You apply, but you do not receive the money yourself.
- Contact an OZEV-authorised installer for a dated quote. The chargepoint must be on the eligible model list.
- Get the documents and permissions you need. See permissions and installation steps.
- Complete the online application (the official pages have a “Start new application” button). Since 1 April 2026 this grant has used a new application platform.
- If OZEV approves, it tells you and your installer. Only then can installation start.
- When the work is finished, the installer claims the grant. OZEV emails you to confirm whether the claim is correct. If it approves the claim, it pays the installer directly.
Find a Grant says the invoice must show the total installation cost minus the grant amount, and that the installer must deduct the grant from your invoice before they claim.
OZEV may audit the application or the installation, and may arrange a site visit. If you do not allow this or do not respond, it may cancel the application.
Official uptake (for context, not a forecast)
The Department for Transport's statistics, correct as of 1 October 2026 and updated on 25 November 2026, report that the renters and flat owners grant has funded:
- 27,208 socket installations in the United Kingdom in total;
- of which 6,869 were in the last 12 months;
- and a total of £9.6 million for those socket installations.
Those are official counts of funded sockets and grant value, not a prediction of how easy it will be to get a grant or an installer, and not a forecast of traffic or income for this site.
Sources
All sources opened and checked on 25 November 2026. Grants, prices and rules change, so check the source before you rely on a figure.
- GOV.UK - Electric vehicle chargepoint grant for renters or flat owners: What you can get
- GOV.UK - Electric vehicle chargepoint grant for renters or flat owners: Eligibility
- GOV.UK - Electric vehicle chargepoint grant for renters or flat owners: Apply
- GOV.UK Find a Grant - Electric Vehicle Chargepoint Grant for Renters and Flat Owners (closes 31 March 2027, 11:59pm)
- GOV.UK - Changes to electric vehicle chargepoint grant schemes from 1 April 2026 (last updated 7 July 2026)
- GOV.UK - Electric vehicle chargepoint grants (last updated 1 April 2026)
- GOV.UK / DfT - Grant schemes for electric vehicle charging infrastructure statistics: 1 October 2026 (updated 25 November 2026)
- GOV.UK - Find an electric vehicle (EV) chargepoint installer
- GOV.UK - Eligible EV chargepoint model list
- GOV.UK - Residential chargepoints: eligible vehicles
Common questions
Can I apply if I have shared ownership?
Yes, in the situations official guidance describes. GOV.UK says a flat bought through the shared ownership scheme can count, and Find a Grant says properties rented through the shared ownership scheme are eligible. If you do not have a tenancy agreement, Find a Grant says you must provide a letter from your housing provider verifying that you pay rent.
Does the grant cover Scotland and Northern Ireland?
Yes. This OZEV grant is for properties in England, Wales, Scotland and Northern Ireland. It does not cover the Channel Islands or the Isle of Man. Scotland also has a separate rural charge-point grant, with different rules, described on the other grants page.
Can I get the grant for a second chargepoint?
Find a Grant says you are only eligible for one grant. GOV.UK also says you cannot apply if you have already claimed this grant or its predecessor schemes.